Mariposa VII: FRAMECAD by Douglass Colony

Five levels of load bearing panels on two levels of podium erected in 40 days (including 422 wall panels, floor assemblies, and detailing and concrete poured and cured).

Douglass Colony is the exclusive FRAMECAD manufacturer for the Rocky Mountain Region. The benefits of FRAMECAD include:
– Total design flexibility
– 1 & 2 hour UL assemblies
– Simplified field erection
– Complete turn-key solution
– Construction in ¼ of the time